I have had a productive week, given the number of interruptions to take each girl to their summer camps and wisdom teeth extraction for the oldest... looking forward to school when I have the house to myself again :) but I will miss them.
Completed: Nothing
New Projects:
I started Crazy Mom Quilts 36 patch QAL. Love how this is coming out with the use of my 1/4 inch foot, so much that I ordered one for my other machine.
Progress:
Hands 2 Help quilt top is done and the back is pieced ready for basting.
The Wonky Spring Log Cabin top that distracted me so much last week is done and the backing pieced, ready for basting.
Two more blocks ready to sew for Bottled Rainbow this week and I got thread to match these and all the remaining blocks.
I was having such success with my 1/4 foot, I got out the Hope Valley Round and Round and did a round on it. I am considering options to modify this for completion. I still have 150 sets of squares that are cut/sewn but they can always be used in the backing.
And... marching season is upon us and I am refreshing all of the school flags for the Color Guard before we get into making the show flags. I have 25 done, 12 in progress and 12 that still need starting.....
Sitting:
American Jane blocks: Hour Glass Pot holders : Pinwheel Quilt Along : Hope Valley QAL : Stamp QAL :Chubby Stars QAL : Leaves D9P : Mandy's fence : HST: New Wave: - 14






